INTRODUCTION
A S S E M B LY STEP 3
ASSEMBLY STEP 4
INTRODUCTION
IMPORTANT PRECAUTIONS
WHITE HARDWARE BAG CONTENTS :
SCREW (G) | BOLT (H) |
15 mm | 30 mm |
Qty: 4 | Qty: 2 |
SPRING WASHER (I) | WASHER (J) |
8 mm DIAMETER | 8 mm DIAMETER |
Qty: 2 | Qty: 2 |
AOpen WHITE HARDWARE BAG.
BSlide HAND RAIL SLEEVE over the top of the hand rail.
CAttach top of HAND RAIL to the console extension using 2 SCREWS (G).
ORANGE HARDWARE BAG CONTENTS : | A Open ORANGE HARDWARE BAG. |
SCREW (K) | B Attach HAND RAIL BASE COVER to |
| |
30 mm | the base frame using |
Qty: 4 | |
| 2 SCREWS (K). |
C Slide HAND RAIL TRANSITION |
IMPORTANT PRECAUTIONS
ASSEMBLY
BEFORE YOU BEGIN
TREADMILL OPERATION
CONDITIONING TROUBLESHOOTING GUIDELINES & MAINTENANCE
SCREW (G) |
HAND RAIL SLEEVE |
HAND RAIL |
SPRING WASHER (I) |
BOLT (H) |
WASHER (J) |
DAttach bottom of HAND RAIL to the base frame using 1 BOLT
(H), 1 SPRING WASHER (I) and 1 WASHER (J).
ESlide HAND RAIL SLEEVE firmly against console.
FRepeat on other side.
HAND RAIL TRANSITION PIECE |
HAND RAIL BASE COVER |
SCREW (K) |
PIECE and HANDLEBAR into |
CONSOLE. |
CRepeat on other side.
DBe sure all bolts and screws are tightened and secured on the treadmill.
ASSEMBLY
BEFORE YOU BEGIN
TREADMILL OPERATION
TROUBLESHOOTING CONDITIONING & MAINTENANCE GUIDELINES
LIMITED
WARRANTY
10
YOU’RE FINISHED!
11
LIMITED WARRANTY
T4_T6_Rev.1.7.indd | 10/19/06 9:22:00 AM |