![1. Startup](/images/new-backgrounds/64391/6439125x1.webp)
4. 12 Hour Drain Cycle
DV opens for 20 minutes every 12 hours
See "3. 12 Hour Drain Cycle" below.
1. Startup
Power switch "ON" Control switch in "ICE"
1. Fill Cycle
2.Ice Purge Cycle
60 seconds
3. Freeze Cycle
Refill (90 seconds)
Low Water Safety
If refill > 90 sec. FT, 150 second shutdown sequence begins
150 sec. Shutdown Sequence
90 seconds |
| 60 seconds |
|
|
|
13
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WV on |
|
|
| LF/S closed | Comp on | UF/S open | LF/S closed | UF/S open | Comp off | GM off | ||||||||||||||
|
| |||||||||||||||||||||||
|
| UF/S open |
| |||||||||||||||||||||
|
|
| UF/S closed (WV off) | FMS on | LF/S open (WV on) | UF/S closed (WV off) | FT exceeded | FMS off | GMPR off | |||||||||||||||
| ||||||||||||||||||||||||
|
|
|
|
|
| WCR on | WCR continues | WCR off | WCR on | Comp continues | WV continues | WV continues until | ||||||||||||
|
|
|
|
|
| |||||||||||||||||||
|
|
|
|
|
| WV off | GM continues | FT started (90 sec.) | FT off (90 sec.) | FMS continues | GM continues | UF/S closes | ||||||||||||
|
|
|
|
|
| GM on | GMPR continues WV on | WV off | GM continues | GMPR continues |
|
|
| |||||||||||
|
|
|
|
|
| GMPR on |
|
| Comp continues | Comp continues | GMPR continues |
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| FMS continues | FMS continues | WV continues |
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
| GM continues | GM continues |
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
| GMPR continues | GMPR continues |
|
|
|
|
|
|
|
|
2.Shutdown & Restart
3.12 Hour Drain Cycle Shutdown & Restart
|
| 1. Bin Full |
|
| 2. Ice Purge Cycle | ||||||
|
| ||||||||||
| 150 |
|
|
|
|
|
|
| |||
| seconds | ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| 90 seconds |
| 60 seconds | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
| 1. Drain Cycle initiates |
|
|
| 2. Ice Purge Cycle | ||||||
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| 3. Icemaker is Off |
| 4. Ice Level Lowered | |
|
| |||
|
|
| See "1. Fill Cycle" above | |
|
|
|
|
|
3. Drain Cycle | 4. 12 hour DC - Restart |
DV on for 20 minutes | See "1. Fill Cycle" above |
Legend:
BC - bin control Comp - compressor DC - drain cycle DT - drain timer DV - drain valve
FMS -
BC open or DC starts | Comp off | GM off | BC closed |
Comp continues | FMS off | GMPR off | or |
FMS continues | GM continues | DV on (DC only) | 20 Min. DT off (DC only) |
GM continues | GMPR continues |
| DV off (DC only) |
GMPR continues |
|
| 12 hour DT reset (DC only) |
Components Energized when the Control Switch is in the "DRAIN" Position
The "DRAIN" position on the control switch is used when cleaning and sanitizing the unit. This allows cleaner and sanitizer to drain from the reservoir and evaporator assembly. When switching to the "DRAIN" position during the freeze cycle, the drain valve does not energize until the 150 second shutdown sequence terminates (2. Shutdown & Restart).
Note: To bypass the 150 second shutdown sequence, move the power switch to the "OFF" position, place the control switch in the "DRAIN" position, then move the power switch back to the "ON" position.
FT - fill timer (low water safety) GM - gear motor
GMPR - gear motor protect relay LF/S - lower float switch UF/S - upper float switch WCR - water control relay
WV - inlet water valve