Addendum to D Class Enterprise Servers System Installation Guide
Installation
Installation
Install the seismic rack kit and the HP 9000 Series 800t D Class Server into an open relay rack using the following steps. References to item numbers in these steps pertain to the item numbers listed in Table
1.Unpack the
2.Remove the standard front bezel (narrow) that was shipped installed on the computer. It is hinged at the top and secured by split molded posts which fit into openings in the
3.Remove the emblem insert and the door from the standard bezel. These items will be transferred to the wide bezel in a later step.
•The molded plastic emblem insert has three tapered
•The plastic door is pivoted in each corner on its left edge. Open the door and flex it carefully, forming a slight bow near the center on the inside edge, to pop the molded plastic pin on the bezel out of the molded socket on the bottom of the door. See Figure
4.To locate the position within the rack for installing the seismic rack kit, allow 5/8 in. above the
Chapter 1 | 13 |