16.Turn on the water to the prearranged facility water lines.

17.(Optional) Remove the two screws from the bottom brackets on the MCS frame.

18.(Optional) Align the access panel with the two holes from step 17.

19.(Optional) Secure the access panel to the MCS frame using the two screws you removed in step 17.

Powering up and configuring the unit

Installation 16