The following figure shows the recommended facility piping approaches to the MCS-200/100.

Item

Description

 

 

1

Preferred piping location: locate chilled water piping taps

 

behind the MCS-200/100—either under or above the

 

floor. Chilled water taps must approach laterally.

 

 

2

Do not locate piping connections or components under the

 

MCS-200/100.

3

Alternate piping location: locating chilled water piping

 

taps in front of the MCS-200/100. Under the floor is

 

possible. This option requires careful planning due to the

 

chilled water hose length limitation.

 

 

Hose openings

The following figures show the dimensions and locations of the various hose openings of the MCS-200/100. MCS-100 hose openings

Facility planning for implementation 52