Be sure the chilled water source is on and flowing prior to the start-up of an MCS-200/100.

Be sure the MCS-200/100 is operational and running before turning on the servers and closing the front and rear cabinet doors.

For more information on the installation of the HP Modular Cooling System 200/100, see the HP Modular Cooling System 200/100 Installation Guide.

Facility planning for implementation 80