Index

A

acceptable water quality specifications

78

Appendix

81, 85

 

B

battery replacement notice

86

 

before installing/running active components

79

BSMI notice

86

 

 

C

cabinet leveling feet

29

cable openings

26

 

Canadian notice

86

 

chilled water

45, 67

 

Chilled Water Base Station, configuring

45

chilled water system components

67

 

chiller unit

67

 

 

 

 

common floor-loading terms

40

 

 

compliance

86

 

 

 

 

components

12, 67

 

 

 

 

components, identification

12

 

 

connecting to facility A/C power

43

 

contact information

88

 

 

 

contacting HP

88

 

 

 

 

control system

79

 

 

 

 

conversion factors for refrigeration

85

 

coolant requirements

71

 

 

 

coolant source planning

45

 

 

cooling 45, 67, 71, 72

 

 

 

cooling capacity 72

 

 

 

cooling considerations

83

 

 

cooling loop sizing

72

 

 

 

customer self repair (CSR)

88

 

 

D

Declaration of Conformity

86

delivery space requirements

21

delivery survey

81

 

disposal, battery

86

 

disposal, waste

86

 

documentation feedback

91

E

electrical

43

 

 

 

electrical considerations

40

 

electrical factors

40

 

 

electrical planning

43

 

 

electrical safety

43

 

 

electrical specifications

18

 

environmental considerations

78, 79

environmental specifications

79

European Union notice

86

 

EXIT signs

86

 

 

 

F

facility considerations

82

facility planning

20, 55, 82

Federal Communications Commission (FCC)

notice

86

 

floor cutouts

 

55

 

floor loading

37, 40

 

floor plan grid

55

 

formulas

85

 

 

G

grounding 41

 

grounding methods

41

grounding systems

41

H

heat load capacity 72

Hook Up Kit

47

hose openings

52

hoses

52

 

I

installation preparation

20, 46, 70, 79

installation prerequisites

20, 21, 23, 25, 37, 70

J

Japanese notice

86

Index 92