Index
A
acceptable water quality specifications | ||
Appendix |
|
B
battery replacement notice |
| ||
before installing/running active components | |||
BSMI notice |
|
|
C
cabinet leveling feet | ||
cable openings |
| |
Canadian notice |
| |
chilled water |
|
Chilled Water Base Station, configuring | |||||
chilled water system components |
| ||||
chiller unit |
|
|
|
| |
common |
|
| |||
compliance |
|
|
|
| |
components |
|
|
|
| |
components, identification |
|
| |||
connecting to facility A/C power |
| ||||
contact information |
|
|
| ||
contacting HP |
|
|
|
| |
control system |
|
|
|
| |
conversion factors for refrigeration |
| ||||
coolant requirements |
|
|
| ||
coolant source planning |
|
| |||
cooling 45, 67, 71, 72 |
|
|
| ||
cooling capacity 72 |
|
|
| ||
cooling considerations |
|
| |||
cooling loop sizing |
|
|
| ||
customer self repair (CSR) |
|
|
D
Declaration of Conformity | ||
delivery space requirements | ||
delivery survey |
| |
disposal, battery |
| |
disposal, waste |
| |
documentation feedback |
E
electrical |
|
|
| |
electrical considerations |
| |||
electrical factors |
|
| ||
electrical planning |
|
| ||
electrical safety |
|
| ||
electrical specifications |
| |||
environmental considerations | ||||
environmental specifications | ||||
European Union notice |
| |||
EXIT signs |
|
|
|
F
facility considerations | |||
facility planning | |||
Federal Communications Commission (FCC) | |||
notice |
| ||
floor cutouts |
|
| |
floor loading |
| ||
floor plan grid |
| ||
formulas |
|
|
G
grounding 41 |
|
grounding methods | |
grounding systems |
H
heat load capacity 72 | ||
Hook Up Kit | ||
hose openings | ||
hoses |
|
I
installation preparation | |
installation prerequisites |
J
Japanese notice |
Index 92