BAGGER ASSEMBLY

12.Slide wheel on and apply two (2) retaining rings. (Some units use a cotter pin instead.)

NOTE: The teeth on the retaining rings should point away from the wheel.

13. Tighten wheel bearing hardware on both sides.

NOTE: If you have not installed the flail reel shaft, do so now.

14.Install rubber flaps between flail blades on the rake shaft. See Figure 3. If this shaft is installed, you DO NOT have to remove the shaft from the unit to install the the rubber flaps.

RUBBER FLAP

FIGURE 3

CABLE

PULLEY

DT11

FIGURE 4

16. Attach the chute to the mainframe.

CHUTE

DT12

FIGURE 5

15.Remove belt guard. Remove cable by remov- ing the pulley. See Figure 4. Attach new cable and replace pulley. Save the old cable for use when the bagger is not used.

17.Install two extenders on the outside of the lower handle assembly. Attach the lanyards with pins to the extenders as shown in Figure 6.

42

Page 42
Image 42
Husqvarna DT22 manual Attach the chute to the mainframe