IBM 9519-AG Setup, Hardware Requirements, Handling Instructions, Workplace Preparation, Height

Models: 21L4364 21L4365 T 85A 9519-AG1 9519-A 9519-AW1 9519-AG 9519-AW

1 42
Download 42 pages 10.28 Kb
Page 9
Image 9
Setup

Setup

Hardware Requirements

This monitor requires a computer with a suitable on-board video sub-system or Video Adapter card that can support SXGA 1280 x 1024, XGA 1024 × 768, SVGA 800 x 600, or VGA 640 x 480 at 60 Hz.

Handling Instructions

Do not support the monitor 1. Lift the monitor by placing both hands under the lower part of the cover.

within the screen area. The Liquid Crystal Display is glass and can be damaged by rough handling or excessive pressure.

2.Before using your monitor for the first time, remove the clear protective film from the front of the screen.

Workplace Preparation

This section gives advice on what you should

consider before you set up your monitor.

Height

The monitor should be positioned so that the top of the screen is slightly below your eye level when you sit at your workstation.

Orientation

Choose a position that gives the least reflection from lights and windows, usually at a right angle to any windows. The monitor should be positioned directly in front of you so that you do not have to twist your body to use it. Tilt the monitor to a comfortable viewing angle.

2

Page 9
Image 9
IBM 9519-AG, 9519-AW, T 85A Setup, Hardware Requirements, Handling Instructions, Workplace Preparation, Height, Orientation