IBM RS/6000 SP manual Step, SP Switch environment MAP, Priority, Component, Action

Models: RS/6000 SP

1 114
Download 114 pages 42.66 Kb
Page 28
Image 28
Component

SP Switch environment (MAP 0600)

Table 1-4. Fan failure diagnostics

Priority

Component

Action

 

 

 

 

1

Fan 1, 2, 3, 4 or 5

a. Check specified fans for blockages or loose cable

 

 

(1 of 5)

 

 

connections.

 

b. Fix any obvious problems and continue at ªStep

 

 

 

 

 

0600-012º.

 

 

c. If you do not find any problems, continue at Priority 2.

 

 

 

 

2

Fan 1, 2, 3, 4 or 5

a. Replace fans as described in Chapter 4, ªFRU

 

 

(2 of 5)

 

 

removals and replacementsº on page 4-1.

 

b.

Continue at ªStep 0600-012º.

 

 

 

 

 

 

3

Switch supervisor card

a.

Replace the card.

 

 

(3 of 5)

 

b.

Continue at ªStep 0600-012º.

 

 

 

 

 

 

 

4

Switch supervisor control cable

a. Replace the cable. Refer to Figure 1-3, for cable

 

 

(4 of 5)

 

 

connections.

 

b. Continue at ªStep 0600-012º.

 

 

 

 

 

5

All replaced

Call next level of support.

(5 of 5)

 

 

 

 

 

 

 

Inner Chassis Cable

P4 (Power Card)

2 x 1

P5

P3

(Switch SV Card)

 

2 x 20

 

P6 (Power Card)

2 x 1

Front Chassis Cable

P7, P8 (CB)

P9 (LED)

 

 

 

 

 

 

 

 

 

 

 

 

P1

P2 (Fan 1)

P3 (Fan 2)

P4 (Fan 3)

P5 (Fan 4)

P6 (Fan 5)

2 x 2

2 x 2

2 x 2

2 x 2

2 x 2

Figure 1-3. SP Switch inner chassis and front chassis cables

Step 0600-012

You performed the recommended action in Table 1-4.

1.Component replaced or reseated.

2.Reconnect all cables inside the SP Switch.

3.Install front panel assembly and reinstall front retaining screws (see ªService position proceduresº on page 3-9).

4.Connect only power (J1) and supervisor (J2) cables at the rear of the SP Switch.

5.Put the SP Switch's circuit breaker into the On (`1') position.

1-8RS/6000 SP: SP Switch Service Guide