Chapter 3. Service procedures

Personal ESD requirements

. . . . . . .

. . . . . .

.

.

.

. .

.

3-1

Tools and files overview

. . . . . . .

. . . . . .

.

.

.

. .

.

3-1

Using the css.snap script

. . . . . . .

. . . . . .

.

.

.

. .

.

3-3

Switch supervisor self-test . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4

Verification tests using Perspectives

.

. . . . .

.

.

.

.

. .

.

.

3-4

Node supervisor verification

.

. . . . .

.

.

.

.

. .

.

.

3-4

Frame supervisor verification

.

. . . . .

.

.

.

.

. .

.

.

3-5

Switch supervisor verification . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 Selecting appropriate switch clocks. . . . . . . . . . . . . . . . . . . . . . . . . . 3-6

Selecting the switch clock source

.

. .

. . . . . . . . . . .

.

3-6

Determining the correct switch clock source

.

. .

. . . . . . . . . . .

.

3-6

Removing and restoring switch resources

.

. .

. . . . . . . . . . .

.

3-7

Removing a switch assembly from the active configuration .

.

. .

. . . . . . . . . . .

.

3-7

Restoring a switch assembly to the active configuration . .

.

. .

. . . . . . . . . . .

.

3-8

Viewing switch partitions

. . . . . . . . . . . . . . . 3-8

Fencing nodes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8

Unfencing nodes

.

. .

. . . . . . . . . . .

.

3-8

Service position procedures

.

. .

. . . . . . . . . . .

.

3-9

Placing a switch assembly into service position

.

. .

. . . . . . . . . . .

.

3-9

Replacing a switch assembly from service position . . . .

.

. .

. . . . . . . . . . .

.

3-9

Resetting the clock and bootlist after servicing a node. . . .

.

. .

. . . . . . . . . . .

.

3-9

Installing firmware updates on SP nodes . .

. . . . . .

.

.

. . . .

.

.

. . . . . .

.

3-10

Installing adapter microcode packages .

. .

. . . . . .

.

.

. . . .

.

.

. . . . . .

.

3-10

Running diagnostics on a switch port .

. .

. . . . . .

.

.

. . . .

.

.

. . . . . .

.

3-12

Personal ESD requirements

The processor uses FRUs that are known to be sensitive to electrostatic discharge (ESD). To prevent ESD damage to FRUs or to prevent system failures, observe the following procedures:

vKeep the FRU in its original static-dissipative shipping container until the FRU is ready to be installed in the system. Move the static-dissipative container near the location where the FRU is to be installed (within ESD wrist strap distance). If the FRU must be put down for any reason, first place it in its static-dissipative container or place it on the static-dissipative mat.

vOpen only the covers that are necessary to complete the task. Any time a cover is open the service representative and all people in the area must be ESD-safe. If power is switched on, or if removing or exchanging any FRU, always use the ESD kit (part 93F2649).

1.Put on the ESD wrist strap.

2.Attach the ESD cable to the wrist strap.

3.Attach the ESD mat to the wrist strap, if required.

4.Attach the insulated clip to the ESD cable.

5.Attach the insulated clip to the frame holes labeled ESD. If the frame holes are not available, use a grounding point on the frame.

Tools and files overview

The following three tables provide an overview of the tools, setup files, and tuning files used in the service procedures.

© Copyright IBM Corp. 1999, 2002

3-1

Page 71
Image 71
IBM RS/6000 SP manual Service procedures, Personal ESD requirements, Tools and files overview

RS/6000 SP specifications

The IBM RS/6000 SP (Scalable Power) is a high-performance computing system that was developed in the early 1990s and has since become a significant player in the realm of supercomputing and enterprise solutions. Designed primarily for scientific, engineering, and complex data analysis tasks, the RS/6000 SP provides powerful processing capabilities, enhanced scalability, and features to support demanding applications.

One of the key characteristics of the RS/6000 SP is its modular architecture, which allows for the addition of multiple nodes. Each node is based on IBM's Power architecture, leveraging the RISC (Reduced Instruction Set Computing) design to achieve high throughput and efficiency. The system can support configurations ranging from a few nodes to hundreds, enabling organizations to scale their computational power as needed based on workload requirements.

The RS/6000 SP employs advanced interconnect technologies, most notably the SP Switch, which ensures high-speed communication between nodes. This interconnect allows for seamless data transfer, ensuring that the system can handle large datasets and complex computations without bottlenecks. The SP's ability to deliver concurrent processing capabilities makes it ideal for parallel computing tasks, including simulations, modeling, and large-scale computations.

In terms of software, the RS/6000 SP was equipped with AIX, IBM's version of the UNIX operating system, which provides a stable and secure environment for enterprise applications. Furthermore, the system supports a vast array of programming languages and tools, including Fortran, C, and C++, along with libraries and frameworks designed for high-performance computing. This compatibility allows developers to optimize their applications to fully utilize the underlying hardware.

Another notable feature of the RS/6000 SP is its extensive support for various workloads, including database management, multi-user applications, and graphical processing. The system was equipped with high-performance graphics capabilities, making it suitable for tasks that require intensive visualization, such as computer-aided design (CAD) and scientific visualization.

Overall, the IBM RS/6000 SP has solidified its role in the high-performance computing landscape, combining advanced technologies, robust scalability, and flexibility to meet the unique demands of research and enterprise environments. Its legacy continues to influence modern computing architectures, embodying IBM’s commitment to innovation and performance in the pursuit of complex problem-solving capabilities.