IBM RS/6000 SP 2-13, switch inner chassis cable, removing, switch inner chassis cable, replacing

Models: RS/6000 SP

1 114
Download 114 pages 42.66 Kb
Page 109
Image 109

SPS assembly, placing into service position 3-9 SPS assembly, removing 4-2

SPS assembly, replacing 4-2

SPS assembly, replacing from service position 3-9

SPS fan control cable, removing

4-3

 

SPS fan control cable, replacing

4-4

 

SPS fans, removing

4-3

 

 

 

 

SPS fans, replacing

4-3

 

 

 

 

SPS front chassis cable 1-8

 

 

SPS partitioning 3-8

 

 

 

 

 

SPS power card, removing

 

4-6

 

 

SPS power card, replacing

 

4-7

 

 

SPS resources, removing

3-7

 

 

SPS resources, restoring

3-7

 

 

SPS supervisor card, removing

4-4

 

SPS supervisor card, replacing

4-5

 

SPS supervisor power cable, removing

4-5

SPS supervisor power cable, replacing

4-6

SPS Switch data cables 2-13

 

 

SPS switch inner chassis cable

1-8

 

SPS-8 Switch data cables

2-13

 

 

SPS, SPS-8 (feature)

5-2, 5-4, 5-6

 

SPS, SPS-8 switch (feature

5-4

 

 

SPS, SPS-8 switch (feature)

5-2, 5-6

 

SRN (Service Request Number) table for SP Switch adapters 1-24

static-sensitive devices 4-1supervisor verification

frame 3-5 node 3-4 switch 3-5

switch adapters (SP Switch), Service Request Number (SRN) table 1-24

switch assembly from active configuration, removing 3-7

switch assembly to active configuration, restoring 3-8 switch assembly, removing 4-2

switch assembly, replacing 4-2 switch cables (feature) 5-8

switch clock source, determining the correct 3-6

switch clock source, selecting the

3-6

switch clocks, selecting appropriate

3-6

Switch data cables, SPS 2-13

 

 

Switch data cables, SPS-8

2-13

 

 

switch fans, removing

4-3

 

 

 

switch fans, replacing

4-3

 

 

 

switch front chassis cable, removing

4-3

switch front chassis cable, replacing

4-4

switch function MAP

 

 

 

 

flowcharted

1-17

 

 

 

 

switch inner chassis cable, removing

4-5

switch inner chassis cable, replacing

4-6

switch inner chassis cable, SPS

1-8

 

switch partitioning 3-8

 

 

 

 

switch power card, removing

4-6

 

 

switch power card, replacing

4-7

 

 

switch power MAP

 

 

 

 

flowcharted

1-13

 

 

 

 

switch resources, removing

3-7

 

 

switch resources, restoring

3-7

 

 

switch supervisor card, removing

4-4

switch supervisor card, replacing 4-5 switch supervisor self-test3-4 switch supervisor verification 3-5

T

tools overview, service 3-1 trademarks A-1

U

unfencing nodes 3-8

updates on SP nodes, installing firmware 3-10

V

verification

frame supervisor 3-5 node supervisor 3-4 switch supervisor 3-5 using Perspectives 3-4

verification and isolation procedures switch supervisor self-test3-4

W

who should use book xv wrap plugs 1-4

Index X-3

Page 109
Image 109
IBM RS/6000 SP manual 2-13, switch inner chassis cable, removing, switch inner chassis cable, replacing, Index