Manuals
/
IDEAL INDUSTRIES
/
Kitchen Appliance
/
Range
IDEAL INDUSTRIES
BUC5034
manual
Buccaneer GT, Falcon GTE Installation, Assembly & Servicing
Models:
BUC5034
1
22
24
24
Download
24 pages
3.43 Kb
17
18
19
20
21
22
23
24
<
>
Install
Connecting the Burner
Assembly
Page 22
Image 22
NOTES
22
Buccaneer GT, Falcon GTE
- Installation, Assembly & Servicing
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
Installation, Assembly and Servicing
General
Technical Specifications of Combination Boilers
Falcon GTE Combination Boiler
Main Dimensions Buccaneer GT Combination Boiler
Hreaded
Boiler Location
Installation Installing the Boiler
Assembly
Ventilation
Hydraulic Connections
Installation
Connection of the Domestic Hot Water Circuit
Example of Installation
Example Buccaneer GT
Assembly Buccaneer GT Combination Boiler
Tools required
Package IC1, IC2, IC3
Assembly
Assembling the base and draining tube
Installing the pipes Assembling the tank front panel
Assembling the boiler onto the tank
Assembly Falcon GTE Combination Boiler
Boiler GTE 4 GTE 5
Assemble the boiler as instructed in figures 1
Installing the tubes
Assembling the boiler on the hot water tank
Assembly
Hydraulic Boiler to Tank Connections Kit BH46
Description
Assembly Controls
Operating Principle
Fitting and Connecting the MB1 Module
Electrical Connections
Tank Sensor
Operating and Installation Package AD127
MB1 Domestic Hot Water Sensor
Boiler Sensor
Installation and Connection
Adjusting the timing of the charging pump
Adjusting the limiter thermostat
Instructions for use
Connections Installation with MB1 Module
Securing the module
Connecting the Burner
Heating and Domestic Hot Water Installation with MB1 module
Starting Up
Assembly Commissioning
Commissioning Secondary Circuit
Servicing Maintenance and Periodic Checks
Buccaneer GT, Falcon GTE Installation, Assembly & Servicing
Buccaneer GT, Falcon GTE Installation, Assembly & Servicing
Ideal Installer/Technical Helpline 01482 498
Top
Page
Image
Contents