INSTALLATION
2.INSTALLING THE BOILER
2.1 Boiler Location
Sufficient space shall be left clear around the boiler.
The figure stated in metres in the drawings below are the minimum recommended dimensions for providing easy access around the boiler.
Buccaneer GT |
| |
| 1357 |
|
| 0. |
|
| 5 |
|
| m |
|
|
| m |
|
| .5 |
| 1030 | 0 |
|
| |
|
| 600 |
|
| m |
|
| .5 |
|
| 0 |
|
| 1 |
|
| m |
|
| BUC5001 |
2.2 | Ventilation |
|
The location of air inlets in relation to the high ventilation openings shall ensure that the air is renewed in the entire volume of the boiler room. The ventilation shall comply with any applicable national or local regulations.
2.3 Assembly
The upper section of the MLS 150 tank (only) is provided with marks allowing precise positioning of IDEAL boilers from the Buccaneer GT or Falcon GTE range (see leaflet provided with these units).
Falcon GTE
GTE | L1 | H |
|
4/150 I | 1180 | 1537 |
|
5/150 I |
| ||
|
|
| |
4/250 I | 1424 | 1587 |
|
5/250 I |
| ||
|
| BUC5038 |
WARNING
Please note that boilers installed in or close to rooms in which the atmosphere is polluted with chlorine or fluorine compounds may be subject to high corrosion.
For example: hairdressing salons, industrial premises (solvents), cooling equipment etc.
Boilers installed in such locations shall not be covered by the warranty.
2.4 Levelling
Levelling of the unit is carried out using the 4 bolts H 10 x 20 (packed in the instruction bag) screwed into the base.
17 |
|
| BUC5002 |
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing | 5 |