Oil or Gas Fired Boilers
Installation, Assembly and Servicing
Buccaneer GT Combination Boiler Falcon GTE Combination Boiler
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Contents
Installing The Boiler
3. Assembly
1.1 Technical Specifications of Combination Boilers
Delivery weight
Boiler
MLS Calorifier
GENERAL 1.2 Main Dimensions
1 Adjustable feet
9-15 mm adjustment range. Rp
Buccaneer GT Combination Boiler
INSTALLATION 2. INSTALLING THE BOILER 2.1 Boiler Location
2.3 Assembly
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Ventilation
INSTALLATION
2.5 Hydraulic Connections
2.6 Connection of the Domestic Hot Water Circuit
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
INSTALLATION 2.8 Example of Installation
Example Buccaneer GT
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
2.+ %%
ASSEMBLY 3 ASSEMBLY 3.1 BUCCANEER GT COMBINATION BOILER
Boiler
Tools required
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
ASSEMBLY
1 Package IC1, IC2, IC3
Assembling the base and draining tube
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Installing the pipes
Assembling the boiler onto the tank
Assembling the tank front panel
ASSEMBLY
ASSEMBLY 3.2 FALCON GTE COMBINATION BOILER
GTE
GTE
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Installing the tubes
Assemble the boiler as instructed in figures
Assembling the boiler on the hot water tank
ASSEMBLY
Assembly
3.3 Hydraulic Boiler to Tank Connections Kit BH46
ASSEMBLY
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
1. On / Off switch
4. Boiler thermometer 5. Three-position switch
4. CONTROLS 4.1 Description
4.2 Operating Principle
Fitting and Connecting the MB1 Module
4.3 Electrical Connections
ASSEMBLY
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Operating and Installation - Package AD127
4.5 MB1 Domestic Hot Water Sensor
Tank Sensor
Boiler Sensor
2. Adjusting the timing of the charging pump
3. Adjusting the limiter thermostat
4. Installation and Connection
Regulating the storage temperature of hot water for sanitary systems
Connections Installation with MB1 Module
Securing the module
ASSEMBLY
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
4.7 Connecting the Burner
ASSEMBLY
4.6 Heating and Domestic Hot Water Installation with MB1 module
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
COMMISSIONING
5.1 Starting Up
5.2 Commissioning Secondary Circuit
Initial starting up shall be performed by a qualified professional
MAINTENANCE AND PERIODIC CHECKS
Safety valve or group
IMPORTANT The safety unit must be used
and replacement of the magnesium anode
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
Technical Training
For details of courses please ring
Ideal Installer/Technical Helpline