IDEAL INDUSTRIES BUC5034 Securing the module, Connections Installation with MB1 Module, #$%% #$%%

Models: BUC5034

1 24
Download 24 pages 3.43 Kb
Page 18
Image 18
Securing the module

ASSEMBLY

￿

￿￿￿￿￿￿￿

-Introduce the bulb G of the limiter thermostat into the boiler

pocket.

- Connect the charging pump to the boiler control console, ensuring that the terminals live (L), neutral (N) and earth (Connections (Installation with MB1 Module)) are properly attached.

-Connect the probe bulb to the boiler control console.

- Introduce the probe bulb into the pocket of the sanitary hot

 

 

 

 

 

￿￿￿￿￿￿￿￿￿￿￿￿

 

 

 

water tank.

 

 

 

 

 

 

 

 

 

 

WARNING

 

 

￿

 

 

 

 

 

If the tank is already fitted with a thermostat, it will not be used :

 

 

 

 

 

 

 

 

 

 

accordingly replace the bulb of this thermostat with the tank probe.

 

 

 

 

 

 

￿￿￿￿￿￿￿

 

 

IMPORTANT: Under no circumstances may the

 

 

 

 

 

 

 

 

wires of the probe (very low voltage) and wires

 

 

￿

 

 

 

 

 

carrying 230 V supply feed be placed in the same

 

 

 

 

 

 

 

 

 

conduit or cable duct. Make sure that a minimum

 

 

 

 

 

 

 

 

 

interval of 10 cm is maintained between them.

 

 

 

 

 

 

 

 

 

Failure to do so can cause interference and lead

 

 

 

 

 

 

 

 

 

to malfunction of the control system and the

 

 

 

 

 

 

 

 

 

deterioration of the electronic circuits.

 

 

 

 

 

 

 

 

 

Securing the module

 

 

 

 

 

 

 

 

 

 

Mount the module by the front so as to secure it with the help of the

 

 

 

 

 

 

 

 

 

 

two screws located on the front section (use a cruciform (Phillips)

 

 

 

 

 

 

 

 

 

 

screwdriver).

 

 

 

 

 

 

 

 

￿￿

 

 

 

 

 

 

 

 

 

￿￿

 

￿

 

 

￿￿￿￿￿￿￿

 

 

 

 

 

 

￿

￿

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

￿￿￿￿￿￿￿￿￿￿￿￿￿

 

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿

 

￿￿￿￿￿￿￿￿￿￿￿￿￿

 

￿

 

 

 

 

 

 

 

 

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

 

 

 

Connections (Installation with MB1 Module)

 

 

 

 

 

 

 

 

 

 

 

 

￿￿￿￿￿￿￿￿￿

 

 

 

 

￿￿￿￿￿￿

 

￿￿￿￿￿

￿￿

 

 

￿￿￿￿￿￿

 

 

 

 

 

￿￿￿

 

 

￿￿￿￿￿￿￿￿￿￿

 

 

￿￿￿￿￿￿￿￿￿￿￿￿

 

 

￿￿

 

 

￿￿￿￿

￿￿￿￿￿

￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿!

￿￿￿￿

￿￿￿￿￿￿ ￿￿￿

 

 

 

￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿

 

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

 

 

 

 

 

￿￿￿￿￿￿￿￿￿

 

 

 

 

 

 

 

 

 

 

 

 

￿￿￿ ￿￿ ￿ ￿ ￿￿￿￿￿￿

￿￿

 

 

 

 

 

￿￿

 

 

 

 

￿

 

 

 

 

 

￿￿￿

 

 

 

 

 

 

 

 

 

￿"￿#$￿%%￿ ￿"￿#$￿%%￿

￿"￿#$￿%%￿

 

 

 

 

 

￿￿￿￿￿￿￿

-Move bridge TL from terminals 1-2 to terminals 1-3.

-Remove bridge LP from terminals 4-5.

-Connect the power supply, the heating pump and the tank load pump as shown.

-Connect the tank sensor.

WARNING

If the installation includes an MB1 module and no room thermostat (TAM), set three position switch 5 (see page 14) to ￿"￿#$￿%%￿ ￿"￿#$￿%%￿ .

If the installation includes an MB1 module and a room thermostat (TAM), set three position switch 5 (see page 14) to AUTO.

18

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

Page 18
Image 18
IDEAL INDUSTRIES BUC5034 manual Securing the module, Connections Installation with MB1 Module, #$%% #$%%, Assembly