IDEAL INDUSTRIES BUC5034 Assembly, Package IC1, IC2, IC3, Assembling the base and draining tube

Models: BUC5034

1 24
Download 24 pages 3.43 Kb
Page 9
Image 9
ASSEMBLY

ASSEMBLY

1 Package IC1, IC2, IC3

À

Á

BUC5010

A

￿￿￿￿￿￿￿

Â

Ã

 

 

2

 

￿￿￿￿￿￿￿2 1

￿￿￿￿￿￿￿

2

1

2

1

 

 

1

 

 

 

Assembling the base and draining tube

1.Lay a sheet of paper in front of the boiler body, take the boiler body off the pallet and place it standing on the furnace door.

2.Remove the adjustable feet assembled on the base and replace them with the four protective plastic plugs supplied in connection kit package BH 46.

3.Unscrew 1/2" plastic plug A from the rear section of the boiler body.

Fit the base onto the feet of the boiler and clip it onto the rear section.

4.Screw the draining pipe onto the rear section. Make the connection watertight with hemp or filler.

5.Set the boiler body on its 1 Package IC1, IC2, IC3feet.

Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing

9

Page 9
Image 9
IDEAL INDUSTRIES BUC5034 manual Assembly, Package IC1, IC2, IC3, Assembling the base and draining tube