Impex MACH V manual See Cable Loop Diagram & Diagram

Models: MACH V

1 29
Download 29 pages 35.82 Kb
Page 19
Image 19

STEP 11 (See Cable Loop Diagram & Diagram 11)

A.) Attach the 118” Upper Cable (#52) to the front opening on the Upper Frame (#8). Attach a Pulley to the opening. Secure the Pulley with one M10 x 2 ½” Allen Bolt (#117), two Ø 7/8” Pulley Bushings (#70), and one M10 Aircraft Nut (#128). Make sure the Ball Stopper of the Cable is underneath the Frame.

B.) Draw the Cable over the Pulley and toward the back of the machine. Attach a Pulley to the open bracket on the top of the Upper Frame. Secure the Pulley with one M10 x 1 ¾” Allen Bolt (#113), one L-shaped Pulley Bracket (#46), two Ø ¾” Washers (#124), and one M10 Aircraft Nut (#128).

C.) Draw the Cable over the Pulley and pull downward. Attach a Pulley to an Angled Double Floating Pulley Bracket (#34). Secure it with one M10 x 1 ¾” Allen Bolt (#113), two Ø ¾” Washers (#124), and one M10 Aircraft Nut (#128). Draw the Cable around the Pulley then pull upward to the opening on the Top Socket Assembly (#9). Let the Bracket hanging for now.

D.) Repeat the Step A above to install a Pulley to the opening.

E.) Draw the Cable over the Pulley then to the open bracket on the top of the Top Socket Assembly (#9). Repeat Step B above to install a Pulley.

F.) Draw the Cable around the Pulley then pull downward to the Selector Rod (#62). Screw the Bolt on the end of Cable into the Selector Rod. Make sure to tighten down the nut on the bolt against the Selector Rod.

G.)Connect a Short Chain (#134) to the end of the Cable with a C-clip (#136). Connect the Lat Bar (#23) to the Short Chain with another C-clip. Adjust the length of Chain to adjust the Lat Bar exercise height.

18

Page 19
Image 19
Impex MACH V manual See Cable Loop Diagram & Diagram