STEP 4 (See Diagram 4)
A.) Insert one Foam Roll Tube (#8) halfway through the hole on the Leg Developer Holder (#7). Insert two Foam Roll Tubes (#8) halfway through the holes on the Leg Developer (#23). Push six Foam Rolls (#30) onto the Tubes from both ends. Plug six Foam Roll End Caps (#31) into the ends.
B.) Attach the Arm Curl Pad (#21) to the Arm Curl Stand (#18). Secure it with two M8 x 5/8” Allen Bolts (#51) and Ø 5/8” Washers (#59). Insert the Arm Curl Stand into the open storage post on the Left Stabilizer when not doing Arm Curl exercise.
C.) Attach an Olympic Sleeve (#43) to the weight post on the Leg Developer. Attach one Spring Clip (#42) to the Sleeve.
D.) When doing Arm Curl exercises, remove the Leg Developer Holder. Insert the Arm Curl Stand into the opening and use the M18 Lock Knob to hold the desired height.
DIAGRAM 4
8