R
6 mPGA604 Socket
Mechanical Design Guide
Re-Validation Notice to Socket Vendors
Any significant change to the socket will require submission of a detailed explanation of the change
at least 60 days prior to the planned implementation. Intel will review the modification and establish
the necessary re-validation procedure that the socket must pass. Any testing that is required MUST
be completed before the change is implemented.
Typical examples of significant changes include, but are not limited to, the following: plastic
material changes including base material or color; contact changes including base material, plating
material or thickness; and design modifications.
For details on validation testing requirements, see Section 6.