Jackson Tempstar GP Table Of Contents, General, Page, Installation, Operating Instructions

Models: Tempstar GP

1 43
Download 43 pages 35.11 Kb
Page 2
Image 2
TABLE OF CONTENTS

TABLE OF CONTENTS

GENERAL

PAGE

Specifications

1

INSTALLATION

 

Unpacking

2

Plumbing Connections

2

Electrical Connections

2

Gas Connection

3

OPERATING INSTRUCTIONS

 

Preparation

4

Power Up

4

Initial Fill

4

Preparing the Dishes

4

Daily Machine Preparation

4

Washing a Rack of Ware

4

Shut Down and Cleaning

4

OVERVIEW OF OPERATION

5

THERMOSTAT ADJUSTMENT PROCEDURE

7

AUTO-CALIBRATION PROCEDURE

8

ELECTRONICS CONTROL BOARD (ECB)

9

TESTING THERMISTORS

10

CONTROL BOARD LED LIGHT INDICATIONS

11

TROUBLESHOOTING

12

DIMENSIONS

19

TABLE DIMENSIONS

20

PHOTOGRAPHS

 

Main Assembly

21

Control Box Assembly-Front View

22

Control Box Assembly-Top View

23

Hood Assembly

25

Cantilever Arm Assembly

26

Tub Assembly

27

Back of Tub, & Drain Assembly

28

Lower Assembly (Right Side)

29

Incoming Plumbing Assembly

30

Gas Pack Assembly

32

Upper Wash, & Rinse Arm Assembly

33

Lower Wash, & Rinse Arm Assembly

34

Steam Coil Assembly

35

Rinse Tank Assembly

37

Electronic Control Drawer Components

38

SCHEMATICS

 

110/120 Volt Schematic

39

208/240 Volt Schematic

40

i

Page 2
Image 2
Jackson Tempstar GP Table Of Contents, General, Page, Installation, Operating Instructions, Photographs, Schematics