J-Allure

Center Panel Installation

Connect the fixed male end of the flexible supply lines to the female supply connections in the wall cutout.

Position the center panel frame in the corner of the bath with the mounting tabs between the edge of the bath and wall.

To open the service door, remove the screw cover below the mixer handle and unscrew the exposed screw. To allow the center panel door to be opened wider, it may be necessary to remove the hand held shower holder as shown below. Open the door.

Unscrew the M6 bolt and install the two brackets. Check the plumbness with the two brackets touching the wall. If necessary adjust the nut till the center panel is perpendicular to the shell deck.

Using the holes in the brackets as a guide, drill two 3/16" holes. Secure the frame to the wall using the wall anchors and screws (#8x1"). Again check the plumbness and make sure the nuts are tight.

CENTER PANEL DOOR

HAND HELD SHOWER

SCREWHOLDER COVER

COVER

BATH RIM

CENTER

PANEL

FRAME

MOUNTING

TAB

M6 BOLT

BRACKET

NUTS

90°WALL ANCHOR

(2 PLACES)

11

Page 13
Image 13
Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Center Panel Installation