J-Allure

Side Walls Caulking

After the side walls are installed, they must be caulked with silicone sealant (not provided). Seal the entire length at the bottom and from the bottom to top where the side wall moulding meets the attached extrusion. Also caulk the joint between the side wall extrusion and the fixed panel frame.

Apply the two foam tapes (provided) to side wall. The first tape will butt up against the curve of the side wall with the second tape against the first tape. Remove the facing paper from both. Install the V seal as shown so that it covers the joint between the foam tapes.

TWO STRIPS OF FOAM TAPE SIDE BY SIDE FROM TOP TO BOTTOM (ONLY ON RIGHT SIDE WALL)

WALL

EXTRUSION

V SEAL

FIXED

PANEL

FRAME

SIDE

WALL

SEALANT

SIDE WALL

SEALANT

ALONG ENTIRE

LENGTH OF

SIDE WALL

BATH RIM

SIDE

WALL

SEALANT

(GLASS PANELS AND GUIDES NOT SHOWN FOR CLARITY)

17

Page 19
Image 19
Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Side Walls Caulking