Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Allure

Models: J-ALLURELuxury Bathing and Entertainment System

1 32
Download 32 pages 26.37 Kb
Page 14
Image 14

J-Allure

Center Panel Installation (cont.)

Connect the ends of the flexible supply lines with adaptors to the hot and cold connections of the mixer.

The steam lines are to be routed in such a way that they travel up from the steam generators and down to the steam heads. Using cable ties, tie up the steam lines so there are no kinks or low spots that may trap water. (Do NOT operate the steam generators without the water supply ON as permanent damage to the generators will occur.) Connect the steam lines to the generators using hose clamps.

For units with TV, insert audio cables, cable TV lead, fan and TV power cords through the hole in drip shield. Plug the power cord into the 230 VAC outlet installed previously as shown in the rough-in section.

DANGER: RISK OF ELECTRIC SHOCK. Connect only to a circuit protected by a Ground Fault Circuit Interrupter.

Reinstall hand held shower holder if removed. Apply sealant to mounting holes if holder was removed completely.

HOT WATER

SUPPLY HOSE

COLD WATER

SUPPLY HOSE

MIXER

DRIP SHIELD (MODELS WITH TV ONLY)

FROM STEAM FITTINGS ON BATH

230V OUTLET

POWER SUPPLY CORD

CABLE TIES

3/8" COPPER TUBING FROM 3/8" SUPPLY FITTING

CABLE TV

FAN POWER CORD,

CABLE TV LEAD

AND AUDIO CABLES

POWER CORD FOR TV

(UNIT WITH TV SHOWN)

12

Page 14
Image 14
Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Allure