Contents
Specifications _______________________________________________________________________ | 2 |
Hardware ___________________________________________________________________________ | 3 |
Framing and Support _________________________________________________________________ | 4 |
Skirt Installation and Service Access _____________________________________________________ | |
Electrical ___________________________________________________________________________ | 9 |
Drain Information and Plumbing _________________________________________________________ | 9 |
Water Supply ________________________________________________________________________ | 10 |
Center Panel Installation _______________________________________________________________ | |
TV Installation (For units with TV) ________________________________________________________ | 13 |
Fixed Glass Panels Installation __________________________________________________________ | |
Side Wall Installation __________________________________________________________________ | 16 |
Caulking ___________________________________________________________________________ | |
Sliding Doors Installation _______________________________________________________________ | 19 |
Dome Installation ____________________________________________________________________ | 20 |
Operation __________________________________________________________________________ | |
Maintenance ________________________________________________________________________ | |
Warranty ___________________________________________________________________________ |
Important: Read complete instructions before beginning installation.
Each whirlpool bath arrives ready for installation, completely equipped with motor/pump assembly and plumbing and fittings necessary for whirlpool operation. The drain/overflow kit and faucet kit must be installed on the bath by the installer.
Remove the bath from the carton. Retain the shipping carton until satisfactory inspection of the product has been made. Do not lift the bath by the plumbing at any time; handle by the shell or frame only.
Immediately upon receipt, inspect the shell and walls before installing. Should inspection reveal any damage or defect in the finish, do not install the bath. Damage or defect to the finish claimed after the bath is installed is excluded from the warranty. Jacuzzi Whirlpool Bath's responsibility for shipping damage ceases upon delivery of the products in good order to the carrier. Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to the warranty information.
All bath units are factory tested for proper operation and watertight connections prior to shipping. Note: Prior to final installation, the bath must be filled with water and operated to check for leaks that may have resulted from shipping damage or mishandling. Jacuzzi Whirlpool Bath is not responsible for any defect that could have been discovered, repaired, or avoided by following this inspection and testing procedure.
Save These Instructions for Future Use.
Date Purchased ____________________________________________________________
Purchased From ____________________________________________________________
Installed By ________________________________________________________________
Serial Number ___________________________
1