Jacuzzi SteamPro manual Locating the Steam Generator, Room Construction and Ventilation Important

Models: SteamPro

1 22
Download 22 pages 48.97 Kb
Page 5
Image 5
Locating the Steam Generator

INSTALLATION

Locating the Steam Generator

The steam generator must be installed upright and level. The steam generator must be located within a 25 foot maximum steam line run to the steam head AND within the 25 foot control wire length to any controls. It may stand attached to a horizontal base or to a wall. For wall mounting, use “keyhole” slots on a cabinet back to slip over screw heads and install a wood cleat or shelf to the wall at the bottom of the unit to help support the bottom. Add a cleat at the top to keep the unit in place.

Install the steam generator indoors only and in a dry location that will not be subject to freezing. If exposure to freezing can not be avoided (e.g., seasonal-use homes), the optional automatic tank drain down valve must be installed. Turn off the power and water supply to the unit if it will not be used for an extended period of time.

Room Construction and Ventilation: Important

The room in which the steam generator is to be located must be constructed of materials that can withstand excessive amounts of moisture and condensation. Large amounts of steam can be released into the room when the enclosure door is opened. Providing natural or forced ventilation of the room will help maintain comfort and minimize moisture damage to the building. Jacuzzi Whirlpool Bath is not responsible for damage resulting from excessive moisture. Consult an architect or engineer for aid in designing your room structure.

HEATED ATTIC

STEAM

ENCLOSURE

INSIDE VANITY

OR CABINET

ADJOINING

CLOSET

BASEMENT

3

Page 5
Image 5
Jacuzzi SteamPro Locating the Steam Generator, Room Construction and Ventilation Important, Installation, Closet Basement