Jenn-Air 720-0511, G18Y07P-02 manual Side Shelf Handle Assembly, Battery Installation

Models: G18Y07P-02

1 34
Download 34 pages 5.77 Kb
Page 9
Image 9
SIDE SHELF HANDLE ASSEMBLY

SIDE SHELF HANDLE ASSEMBLY

Estimated Assembly Time: Approximately 5-7 minutes

Required Tools: Phillips Screwdriver (not included)

1.Remove the four side shelf handle screws from the side of the shelf.

2.Align the holes in the side shelf handle with the holes in the side shelf.

3.Insert the screws and tighten.

BATTERY INSTALLATION

1.Remove the ignition button housing.

2.Insert the battery into the housing with the positive (+) terminal facing outward.

3.Replace the ignition button housing after the battery has been installed.

7

Page 9
Image 9
Jenn-Air 720-0511, G18Y07P-02 manual Side Shelf Handle Assembly, Battery Installation