5.Slide-In Cutout (Figure5)
*Use the overhang measurementto figure the "A" dimension:
Overhang 1/2" (1.27 cm) to 1" (2.54 cm) .... "A" =
Overhang 1" (2.54 cm) to
. Carefullymarkthe countertopand recheckyour dimensions.
•Before you cut, checkthe rear countertopdimensions. (See#6.)
NOTE:The minimumclearancebetweenthe cutoutand cabinetdoors and drawer edge is 7/8".
6. Slide-In Cutout (Figure 6)
•Check your marked up dimensionscarefully.The rear dimensions shown in the illustrationmust be maintained.
NOTE:Wherethis isnot done,it willbe necessaryto relievea portionof the undersideof the countertop and/or support members to clear the range rear panel.
•Cutting tolerance is = 1/'6(.16 cm.)
•Carefullymake the cutout.
7. Free-StandingCutout (Figure 7)
•
•Carefully mark the countertop, recheck your dimensions and make the cutout.
NOTE:Range side panels may be desirable if the cutout is too large or
•Proceedto step 8.
_, Over-RangeCabinets (Figure 8)
-To eliminate the hazard of reaching over a heated surface unit, cabinet storage space abovethe rangeshould be avoided. If cabinet storageis to be provided,the riskcanbe reducedby installinga rangehoodthat projects horizontallya minimum of 5 inches beyond the bottom of the cabinets.
However,if
B = 30" (76.2cm) minimum clearance betweenthe top of the cooking platformand the bottom of an unprotectedwood or metal cabinet.
protected by not less than 1/4" (0.635 cm) FLAME RETARDANT B = 24" (60,96 ore) minimumwhen bottomof wood or metal cabinet is millboardcovered with not less than No. 28MSGsheet steel, 0.015"
(0.038 cm) stainless steel,0.024" (0.061 cm) aluminumor copper. NOTE:If you are NOT installinga downdraftunit, skip to step 13.
9.Measure For Floor Vent
•If unit will be ventedthrough the wall, go to #11.
•If floor willbe concrete slab,see enclosedductinginstructions.
•For let and right hand venting through cabinet toe space, see special instructionson pages 7 & 8.
NOTE:Optimumcenterlinevent locationis 11"to 17" fromedgeof cabinet. Ventslocatedless thanthis distancewill requiretheunitto be raised over blower for installation.
_" FloorVent Cutout(Figure 10)
-Checkthe direction of the floor joists (seeillustration.)
•Locate6" square cutout anywherewithin shadedarea. The cutout must miss the floor joists!
•Recheckyour dimensions and make the cutout.
•Skip to Step #12.
(Figure5)
(Figure 6)
1./,._,.-
| (Figure 7) |
|
|
| _ | _) | |
| |||
_ |
|
|
|
)" | _ "" | I | |
_ |
| T |
|
IF | //_/_ |
| / |
|
| ||
_ | O O | O O |
|
(Figure8)
(Figure 10)
3