Keiser 1030, 1031 manual Step Three Secure and tie wires and replace lid, Step Four Test compressor

Models: 1031 1030

1 14
Download 14 pages 33.88 Kb
Page 12
Image 12
Step Three: Secure and tie wires and replace lid

Step Three: Secure and tie wires and replace lid

Make sure that all of the slack is inside the computer control system box. Use a zip tie to bind the wires and hoses on the outside of the box. Use the wire cutters to cut off the excess.

zip tie all wires and hoses

Next, gather the four wires inside the box, and arrange them so that the small grey LED on either side of the box is not blocked from view. Tie these wires using two or more zip ties. Cut the excess from the ties.

secure wires to center of CGS box

Replace the lid on the computer control system box, and return the screw on either side of the box.

Step Four: Test compressor

Plug the compressor back in, the displays should light up, and if the compressor is below 95 PSI both compressors should start. The compressor should pump up to approximately 117 PSI and shut off. When each motor shuts off, you should be able to feel air blow through the tube that holds the foam, which is located on the same side as the motor that has just shut off.