There are four steps to Allenair® valve installation:

push on board, pull on wire

Pull each of the four wires back out the hole one by one. Save the rubber grommet.

There are four steps to Allenair® valve installation:

1Adjust and mount new valve

2Install single to double splitter and electrical wires

3Secure and tie wires and replace lid

4Test compressor

5

Note: Keep two things in mind when you are ready to install the new valves.

First, the new valve requires a different mount. Second, the electrical wiring requires the

installation of a single to double adapter on the circuit board.