Kenmore 721.80522, 721.80524 A, Warning, k WARNING, Drill The Holes In The Wall And Upper Cabinet

Models: 721.80523 721.80522 721.80409 721.80402 721.80529 721.80403 721.80404 721.80524

1 18
Download 18 pages 55.96 Kb
Page 14
Image 14
DRILL THE HOLES IN THE WALL AND UPPER CABINET.

STEP 4: PREPARE THE WALL AND UPPER CABINET FOR INSTALLATION

DRILL THE HOLES IN THE WALL AND UPPER CABINET.

A, WARNING _,

BE VERY CAREFUL WHEN DRILLING HOLES INTO THE WALL.

Electrical wires could be concealed behind the wall covering and if the drill hits them you could get an electric shock.

1.Find the points on the mounting plate labeled "A", "B", "C" and "D". Drill a 3/16" diameter hole at any of these points that are in front of a wall stud. Drill a 3/4" diameter hole at any of these points that are over drywall.

2.Drill a 3/8" hole at points "J" and "K" on the upper cabinet template.

NOTE: If the bottom of the upper cabinet is recessed 3/4" or more, you will need 2"x2" filler blocks (not included) to provide additional support for the bolts. See Figure 24.

Mark the center of each filler block and drill a 3/8" diameter hole at the mark.

Align filler blocks over the two openings in the top of the microwave oven cabinet and attach to cabinet with masking tape. See Figure 25.

3.Cut or drill a 2" diameter hole at the area marked "M", "power supply cord hole" on the upper cabinet template. If the upper cabinet is metal, you will need to cover the edge of the hole with the power supply cord bushing (supplied) to prevent damage to the cord from the rough metal edge.

_k WARNING

_k

cabinet

 

 

cabinet front filler block

YOU MUST COVER THE EDGE OF

bottom shelf

THE POWER SUPPLY CORD HOLE

 

IN A METAL CABINET WITH THE

 

POWER SUPPLY

CORD

BUSHING.

 

FAILURE TO DO SO COULD

 

RESULT IN DAMAGE TO THE CORD

 

AND ELECTRIC

SHOCK.

Figure 24

 

 

 

4. Cut out the venting areas (with the saber saw):

 

• Roof Venting: cut out the shaded area marked "L"

 

on the upper cabinet template.

 

filler

• Wall or Room Venting (Recirculating): go to STEP

block

5, INSTALL THE MOUNTING PLATE, located on page 15.

5.Use caulking compound to seal the exterior wall or roof opening around the wall cap or roof cap.

Figure 25

14

Page 14
Image 14
Kenmore 721.80522, 721.80524, 721.80404, 721.80403 A, Warning, k WARNING, Drill The Holes In The Wall And Upper Cabinet