other brown wire to the other capacitor terminal.
Replace the rubber cap over the top of the
capacitor. Put the capacitor into the mounting
bracket on the lower section of the wiring box.
the front of the
blower box under the
control using the four
screws removed in Step 3.
If the vent is installed in
the cutout, it may have to
be lifted out of the
countertop opening a few inches to attach wiring
box.
Use two or more people to move and install
downdraft vent.
Excessive Weight Hazard
I
Failure to follow this instruction can result
in back or other injury.
Insert downdraft
blower box and
motor into countertop cutout. Two people are
recommended to support the weight of the
downdraft vent during lifting.
Position the
downdraft vent cover
so that it is aligned with
light pencil marks made
on the countertop in Step
6. Use screws to attach legs
to cabinet floor. Check that blower
box is vertical. (Adjust legs until
Connect 6” ductwork to blower duct.
Position ductwork to avoid wall studs
and floor joists. Complete all
ductwork. Use duct tape to seal all joints.
Ductwork must end with a wall or roof cap.
Insert grease filter and place grille in
position. If downdraft vent is
installed between two appliances,
attach a support brace to each side of the
downdraft vent cover.
blower box is vertical.) Tighten screws that attach
the legs to the blower box. Repeat Steps 1-21 for each downdraft vent.
b-l
Turn power supply on. Place the
, control knob securely onto the stem.
Check the operation of the blower
and speed control. If one does not operate,
disconnect power source and check that wire
connections have been made correctly. 49.

Numbers

correspond

to steps.

15