20
Slide nut and ferrule
onto tubing
1
Ferrule
Nut

Connect to Water Supply

Copper tubing only: Slide nut then ferrule onto copper
tubing about 1 (2.5 cm).
NOTE: To avoid vibration during operation, route the
water supply line so that it does not touch the
dishwasher base, frame or motor.
Tighten copper or braided
tubing connection
3
Hold the 90°elbow fitting still with one adjustable wrench
and tighten the nut with second adjustable wrench.
Helpful Tip: Use a 5/8 open ended wrench for easier
access to tighten connection.
Connect water supply
using copper or flexible line
2
Copper tubing only: Put the tubing into the 90°elbow
fitting as far as it will go (the copper tubing bends and
kinks easily). Slide the nut and ferrule forward and start
the nut onto the elbow threads.
Flexible braided connection: Secure nut to elbow using
5/8 open ended wrench or adjustable wrench.
NOTE: Do not use Teflon®tape with compression fittings.
9Check for plumb and
adjust legs if needed
Check that leveling legs are firmly against the floor.
Close and latch the door, and place level against the
front panel. Check that dishwasher is centered from front
to back in the opening. If needed, adjust leveling leg until
dishwasher is plumb. Repeat for other side of dishwasher.
Helpful Tip: Push up on front of dishwasher to raise
dishwasher off the ground to adjust front legs. With
some installations, it may be easier to adjust the front leg
using the 3/16 hex head socket or adjustable wrench.
Preferred method Optional method
Check level side to side and
adjust legs if needed
10
Place level against top front opening of tub. Check that
dishwasher is level from side to side. If dishwasher is not
level, adjust front legs up or down until dishwasher is
level.