Landice 8700 manual See Sprint 2 Wiring Schematic for Speed POT Settings

Models: 8700

1 85
Download 85 pages 7.59 Kb
Page 74
Image 74

74

2.120 VAC between (yellow) and (white) wires when the "DOWN"switch

is engaged,and 0 VAC when the switch is disengaged.

YES

NO

incorr ect readin gs

Replace elevation motor.

1. check elevation switch for continuity.

2. check wiring.

APPENDIX 1: SPRINT 1 Speed Calibration

*SEE SPRINT 2 WIRING SCHEMATIC FOR SPEED POT SETTINGS

STEP 1:Verify KBLC - 118 pot settings are as shown below

KBLC - 118 SPRINT 1 MOTOR CONTROL

BOARD

6:00

ACCEL

10:00

12:00

10:00

3:00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 74
Image 74
Landice 8700 manual See Sprint 2 Wiring Schematic for Speed POT Settings