Corner Installations Continued | Horizontal Venting |
Vertical Venting
| ||
(149mm) |
| (149mm) |
|
|
|
3” (76mm)
Figure 5
Parallel Installations
Vertical Venting
(423mm)
8”
(203mm)
|
| Figure 7 |
|
| Alcove Installations |
|
| Minimum alcove height is 41” (1041mm), minimum width is |
|
| |
|
| Note, it is quite difficult to load pellets into the hopper when |
|
| |
|
| installed in an alcove only 41” (1041mm) high. For alcove |
3” (76mm) | wall clearances see parallel clearances below. |
9” Top Vent (229mm)
8”
(203mm)
Figure 6
INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENT MANUFACTURER.
41”
(1041mm)
48”
(1219mm)
Figure 8
(1073mm)
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.