Lennox International Inc AIR HANDLERS, CBWMV Troubleshooting Heating Sequence of Operation

Models: CBWMV AIR HANDLERS

1 20
Download 20 pages 38.01 Kb
Page 20
Image 20
Troubleshooting: Heating Sequence of Operation

Manual background WARNING

WARNING TO SERVICE PERSONS! Electric shock hazard. When electrical power to the internal control box components must be available for troubleshooting, a common practice is to construct a ass" of the door interlock switch. When such a by−pass is in place, a potential shock hazard is present which can cause injury or death. Make sure any door interlock switch by−pass has been removed after troubleshooting is complete and BEFORE attempting any re- pairs to the control box components!

Troubleshooting: Heating Sequence of Operation

CONDITIONS:

Power On

Normal Operation LED: Steady Flash

Thermostat (S1) Calls for Heat

YES

Fixed blower−ON delay (45−second) complete

NO

Check for 24 Volts Between W and C at A52 Terminal Strip

Blower Operates at the Heating Speed Selected by HEAT Jumper and ADJUST Jumper Positions on the BDC3 Control (A52)

YES Manual background

CFM Light on A52 Indicates Blower

Speed Selection with 100CFM / Blink

YES

Thermostat (S1) Demand Satisfied

YES

30 Second Blower Off Delay (Fixed) Complete

YES

Demand for Heat Satisfied

NO

Check for 24 Volts Between Pins 3 and 2 on J49

Page 20

505047 09/06

Page 20
Image 20
Lennox International Inc AIR HANDLERS, CBWMV installation instructions Troubleshooting Heating Sequence of Operation