INSTALLATION
BASIC CONNECTION (42PC1RV*, 42PC3RV*)
■These models have two cable arrangement methods according to the stand type.
Stand type 1
Arrange the cables as shown picture.
INSTALLATION
Stand type 2
1Hold the CABLE MANAGEMENT with both hands and push it as shown.
CABLE MANAGEMENT
2Connect the cables as necessary.
To connect an additional equipment, see the External equipment Connections section.
3Reinstall the CABLE MANAGEMENT as shown.
14