M4 nuts
32" rack depth
M4 screws
M4 nuts
M4 nuts
18" rack depth
M4 screws
M4 nuts

Installation

3.Determine the height position inside the rack enclosure where you want to mount the UPS or battery cabinet.

CAUTION

! Reduce risk of tipping the rack enclosure by placing UPS or battery cabinet in the lowest possible rack position.

Install rear member of each

 

M5 screws

bracket assembly into rack

Front rack

 

enclosure with two (2) M5

mounting rails

 

screws provided in this kit.

 

 

(See figure at right.) Return

 

 

flanges on bracket assembly

 

 

fit to the inside of rack

 

 

mounting rails. Insert screws

 

 

loosely (finger-tight) into top

 

 

and bottom holes of return

 

Rear rack

flange on rear member.

 

mounting

Extend bracket assembly by

M5 screws

rails

sliding front member for-

 

 

ward until it touches the front rack mounting rail. Insert two (2) M5 screws loosely (finger-tight) into top and bottom holes of return flange on each front member. Make sure bracket assemblies are at the same mounting height on all four (4) rack mounting rails.

4. Locate eight (8) M4 screws and eight (8) M4 nuts from hardware pack in this kit.

Each nut has a locking, nylon insert that begins gripping the screw when it is halfway tight. Make sure to tighten nut and screw completely to assure locking action. Fasten rear member and front member together using four

(4) screws and four (4) nuts

per bracket assembly as shown in the figures at right.

For maximum support, locate fasteners for each bracket assembly as far apart as possible, depending

on rack depth, while still joining both members (See

figures at right). Check alignment of bracket assemblies and TIGHTEN ALL SCREWS FROM STEPS 3 and 4.

10

DISCONTINUED

 

PRODUCT

Page 14
Image 14
Liebert gxt2u user manual Bracket assembly into rack