Manuals
/
Liebert
/
Computer Equipment
/
Network Card
Liebert
user manual Liebert XDK Rack Enclosure With Integrated Water-Based Cooling
Models:
XDK
1
1
32
32
Download
32 pages
28.47 Kb
1
2
3
4
5
6
7
8
<
>
Install
Fan Replacement
Maintenance
Configuration
Preparations for Connecting
Nominal values at setup site
Safety
Heat exchanger access
Technical data
Door locking mechanisms, opening switch
Page 1
Image 1
Pr
e
ci
s
io
n
C
o
o
li
n
g
Fo
r
B
u
si
n
es
s
-C
r
iti
c
al
C
o
n
tinuit
y
™
Li
e
be
r
t X
DK
™
Ra
c
k E
n
clos
u
r
e
W
i
t
h
I
n
te
g
r
a
t
e
d
W
at
e
r-B
a
s
e
d
Co
o
l
i
n
g
Us
e
r
M
a
n
u
a
l–17kW
Page 2
Page 1
Image 1
Page 2
Contents
User Manual-17kW
Liebert XDK Rack Enclosure With Integrated Water-Based Cooling
Precision Cooling
For Business-Critical Continuity
SAVE THESE INSTRUCTIONS
IMPORTANT SAFETY INSTRUCTIONS
5.0 INSTALLATION AND COMMISSIONING
TABLE OF CONTENTS
6.0 SERVICING AND MAINTENANCE
1.0 INTRODUCTION 2.0 OPERATING CONDITIONS
TABLES
FIGURES
1.0 INTRODUCTION
2.0 OPERATING CONDITIONS
2.1 Proper Application
General operating data
3.0 DESCRIPTION
3.1 General function
Air Duct
Warm
Front
Rear
19 Equipment
Side of XDK
Technical data
3.2.1 Data Overview-XDK
XDK general data
Description
3.4 Automatic Door Opening
3.3 Control
Figure 3 XDK door and automatic opening mechanism
3.4.2 Initial Commissioning
3.4.1 Function
Figure 4 Door locking mechanisms, opening switch
3.4.4 Manual Opening
3.4.3 Manual Closing
1. Press LED switch for electromagnet activation 2. The LED lights up
1. Press LED switch - green LED doesn’t light
4.1 Packaging Material
SAFETY INFORMATION
4.2 Handling
4.0 EQUIPMENT INSPECTION, HANDLING AND STORAGE
4.4 Returning the Unit in Case of Damage
4.3 Storage
5.0 INSTALLATION AND COMMISSIONING
5.1 Preparation for Installation
5.2 Positioning the XDK
5.2.1 Remove Recirculation Air Duct Transport Lock
5.3.1 Preparing Heat Exchanger for Initial Commissioning
5.3 Water Connection
Figure 6 Heat exchanger access
Figure 7 Control valve
Top View
Installation and Commissioning
Figure 8 Heat exchanger
Figure 9 Heat exchanger connection
5.4 Condensed Water Connection
Preparations for Connecting
Figure 10 Bottom plate with cutouts
Rear
5.6 Sealing the Cabinet
5.5 Electrical Connection
The units fans will rotate clockwise
6.1.1 Fan Replacement
6.0 SERVICING AND MAINTENANCE
6.1 General Inspection on Fans-Annual
Figure 11 Replacing a fan
Reinstall the fan by reversing the steps to remove the fan
6.2 Inspect the Heat Exchanger-Annual
Figure 12 Heat exchanger replacement
6.3 Replacing the Heat Exchanger
Regularly check the condensed water drain and clean if necessary
Servicing and Maintenance
Dismantling and Disposal
7.0 DISMANTLING AND DISPOSAL
Prevalent impurities and removal methods
8.0 WATER PURITY REQUIREMENTS
Suggested hydrologic levels
Comments
8.1 Unit Installation Checklist
Nominal values at setup site
8.2 Commissioning Certificate
Table 6 XDK - Commissioning certificate
Nominal values kept
Table 8 Type of cabinet
Configuration
Control of status
Water Purity Requirements
Table 11 Electrical data / documents
Table 10 Cold water facility on site
Table 12 Function check
Water Purity Requirements
Correctness of function check protocol certified by
Commissioning performed by day to day operating
Table 12 Function check continued
Water Purity Requirements
Water Purity Requirements