Liebert XDK user manual Unit Installation Checklist

Models: XDK

1 32
Download 32 pages 28.47 Kb
Page 25
Image 25

Water Purity Requirements

8.1Unit Installation Checklist

___ 1.

Check unit for damage on delivery

___ 2.

Check for level floor

___ 3.

Check maximum floor load

___ 4.

XDK feet adjusted, if applicable

___ 5.

XDK is level

___ 6.

No remains of packaging in the XDK

___ 7.

All installation tools removed

___ 8.

Cable entries into the unit correct and air-tight

___ 9.

Cable connections checked

___ 10.

Cold water connection does not leak

___ 11.

Pressure test performed

___ 12.

Water circuit bled

___ 13.

Water flow rate adjusted

___ 14.

Condensed water pipe clear

___ 15.

Water system odor trap in order

___ 16.

Heat exchanger tray connected to condensed water pipe

___ 17.

Fan function checked

___ 18.

All front panels closed (separation of air flows)

Comments

Signature

Date

Checker

 

21

Page 25
Image 25
Liebert XDK user manual Unit Installation Checklist