®
CLEAN • FRESH • AIR
OPERATION AND
INSTALLATION MANUAL
For Models:
500DCS ControlAir 15 850FD/DD Analog Controls 700FD/DD Analog Controls 1200FD/DD Analog Controls
NOTE: ALTHOUGH SOME MODELS DIFFER IN OPERATION, THE BASIC STEPS ARE SIMILAR.
CAUTION
Before installation, careful consideration must be given to how the system will operate if connected to any other piece of mechanical equipment, i.e. a forced air furnace or air handler, operating at a higher static. After installation, the compatibility of the two pieces of equipment must be confirmed, by measuring the airflow’s of the Heat/Energy Recovery Ventilator (HRV/ERV), by using the balancing procedure in this manual.
500ERV ControlAir 15
700ERV Analog Controls
1200ERV Analog Controls
It is always important to assess how the operation of any HRV/ERV may interact with vented combustion equipment (ie. Gas Furnaces, Oil Furnaces, Wood Stoves, etc.).
NEVER install an HRV/ERV in a situation where its normal operation, lack of operation or partial failure may result in the backdrafting or improper functioning of vented combustion equipment!!!
TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION
Installing Contractor
Telephone / Contact
Serial Number
Installation Date | Model |
* LEAVE FOR HOMEOWNER
NOTE: Due to ongoing research and product development, specifications, ratings and dimensions are subject to change without notice.
0105