Table of Contents | 3 |
General Information |
| |
Introduction & Important Information | 2 | |
Safety Precautions | 4 | |
Features & Specifications | 6 | |
Stove | Installation |
|
Planning The Installation | 7 | |
Floor Protection Requirements | 8 | |
Stove Placement Requirements | 9 | |
Clearances | 9 | |
Chimney Requirements | 10 | |
Chimney Termination Requirements | 11 | |
Outside Air Requirements | 11 | |
Alcove Installation Requirements | 12 | |
Mobile Home Requirements | 13 | |
INSTALLATION DIAGRAMS |
| |
Standard Ceiling with a Factory Built Chimney | 14 | |
Cathedral Ceiling with a Factory Built Chimney.... | 14 | |
Exterior Factory Built Chimney | 15 | |
Hearth Stove Positive Connection | 15 | |
Hearth Stove Direct Connection | 16 | |
Interior Masonry Chimney | 16 | |
Insert | Installation |
|
Planning The Installation | 17 | |
Insert Size Requirements | 18 | |
Insert Placement Requirements | 18 | |
Hearth Requirements | 18 | |
Masonry Fireplace Requirements | 19 | |
Zero Clearance (Metal) Fireplace Requirements | 19 | |
Drafting Performance | 19 | |
Leveling Bolt Installation | 19 | |
20 | ||
INSTALLATION DIAGRAMS |
| |
Insert with Positive Connection | 21 | |
Insert with Direct Connection (Masonry Fireplace)21 | ||
Insert with Direct Connection (ZC Fireplace) | 22 | |
Insert with Face Seal Connection | 22 |
Operating | Your Appliance |
|
Safety Notice | 23 | |
Before Your First Fire | 23 | |
Opening the Door | 23 | |
Starting a Fire | 24 | |
Adjusting the Burn Rate | 25 | |
Ash Removal | 25 | |
Optional Blower Operation | 26 | |
26 | ||
Overnight Burn | 26 | |
Normal Operating Sounds | 26 | |
Hints for Burning | 27 | |
Selecting Wood | 27 | |
Dry Wood is Key | 27 | |
Testing Wood Moisture | 27 | |
Why Dry Wood is Key | 27 | |
Wood Cutting and Storage | 27 | |
Troubleshooting | 28 | |
Maintaining Your Appliance |
| |
Daily Maintenance | 29 | |
Remove Ash | 29 | |
Clean The Glass | 29 | |
Monthly Maintenance | 30 | |
Door and Glass Inspection | 30 | |
Check For Creosote Buildup | 30 | |
Yearly Maintenance | 31 | |
Touch Up Paint | 31 | |
Blower Cleaning | 31 | |
Firebrick and Baffle Inspection | 31 | |
Door Parts | 32 | |
Replacing the Glass | 32 | |
Replacing the Door Gasket | 32 | |
Replacing the Door Handle | 32 | |
Firebox Parts | 33 | |
Floor & Side Firebrick Removal & Replacement... | 33 | |
Baffle Removal and Replacement | 34 | |
Air Tube Removal and Replacement | 34 | |
Warranty |
|
|
Warranty | 35 | |
Listing Information |
| |
Listing Information | 36 | |
Optional | Equipment |
|
Stove Legs | 37 | |
Pedestal | 37 | |
Rear Blower Installation | 39 | |
Outside Air Boot Installation | 40 | |
Surround Panels | 41 | |
Front Blower | ..................................................... | 43 |
Index |
|
|
Index | 44 |
Travis Industries | 93508131 | 4 020327 |