Lopi Answer Wood Stove Interior or Exterior Masonry Chimney, C o n n e c t i o n, N O T E

Models: Answer Wood Stove

1 44
Download 44 pages 41.42 Kb
Page 16
Image 16
H e a r t h S t o v e D i r e c t

16 Stove Installation (for qualified installers only)

H e a r t h S t o v e D i r e c t

C o n n e c t i o n

N O T E :

Direct connections require installation of an airtight, non- combustible block-off plate or damper adapter

NOTE: The chimney must have a clay tile liner. If it does not, the installation must use a positive connection (full reline). The entire fireplace and chimney must be clean, undamaged, and meet all local building codes (UBC, etc.). Damage must be repaired prior to installation. The chimney must be 15' to 33' tall.

Max. 8”

Combustible Mantle

Min. 18"

Floor ProtectionInterior or Exterior Masonry ChimneyManual backgroundManual background (See the section "Floor Manual backgroundManual backgroundManual background Protection Requirements" Manual backgroundManual backgroundManual background for more details)Manual backgroundManual background

Clay

Liner

Stainless steel chimney connector must Extend 1' past the block-off plate or to the flue liner

Airtight

Insulated

Clean-Out

Remove damper or wire it open

Block-off plate or damper adapter

See the section "Stove Placement Requirements" for minimum clearances required

Interior or Exterior Masonry Chimney

N O T E :

This type of installation requires a UBC approved masonry connector or a factory built (U.L. Listed) wall thimble.

NOTE: The chimney must have a clay tile liner. If it does not, the installation must use a positive connection (full reline). The entire fireplace and chimney must be clean, undamaged, and meet all local building codes (UBC, etc.). Damage must be repaired prior to installation. The chimney must be 15' to 33' tall.

See the section "Stove Placement Requirements" for minimum clearances required.

Chimney connector sections

See the section "Floor Protection Requirements"

Clay Liner

Min. 18" clearance to ceiling

This type of installation requires a UBC approved masonry connector or a factory built (U.L. Listed) wall thimble.

Make sure the clean-out seals in place.

Travis Industries

93508131

4 020327

Page 16
Image 16
Lopi Answer Wood Stove Interior or Exterior Masonry Chimney, C o n n e c t i o n, H e a r t h S t o v e D i r e c t