Stove Installation (for qualified installers only) | 13 |
Mobile Home Requirements
•Outside air must be installed - see "Outside Air Requirements" on page Error! Reference source not found.11
•Chimney connector and chimney must be one of the following types:
• DURAVENT model DVL with DURATEC chimney | • GSW Double Wall Chimney Connector with Super Chimney |
• DURAVENT model DVL with | • SELKIRK METALBESTOS model DS connector with model SSII chimney |
• | • I.C.C. Excel |
• SECURITY model DL with SECURITY model ASHT or S2100 chimney | • Standard Masonry Chimney with any one of the above listed connectors |
• |
|
NOTE: Reduced clearance connectors may not connect to the flue collar – order an appliance adapter for the connector being used.
•Stove placement must maintain the following clearances to combustibles (drywall, furniture, etc.)
Minimum | Clearance | Reduced Clearance | |
(See | the | illustration below) | Connector |
A | Sidewall to stove | 13" | |
B | Backwall to stove | 9" | |
C | Cornerwall to stove | 7 1/2" | |
D | Connector to sidewall | 21 1/2" | |
E | Connector to backwall | 11 1/2" | |
F | Connector to cornerwall | 16 1/2" |
| Corner Installations |
Straight Installations |
|
d |
|
e | f |
a |
|
b | c |
|
NOTE:
Measure clearances to the stove top.
•If using offsets, use the connector clearance listed to the right, not the connector manufacturer's clearance.
•The appliance must be secured to the floor (consult your building official). Secure the outside air boot to the floor and stove to insure the stove does not dislocate.
•Mobile home installations require a spark arrester at the chimney termination.
•The appliance must be grounded to the chassis of the mobile home (consult your building official).
WARNING: DO NOT INSTALL IN SLEEPING ROOM.
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL, AND CEILING/ROOF MUST BE MAINTAINED.
12” Min.
Connector Clearance (as outlined above)
Stove Clearance (as outlined
Travis Industries | 93508131 | 4 020327 |