Mad Catz 5MPRA6D-147, 5MPRA6E-148, 5MPRA6E3-148 Installation, Teflon Taping Instructions

Models: 5MPRA6F-156 5MPRA6D3-147 5MPRA6E3-148 5MPRA6E-148 5MPRA6C-146 5MPRA6F3-156 5MPRA6D-147

1 12
Download 12 pages 19.21 Kb
Page 4
Image 4
INSTALLATION

NOTICE: Port threads

are: Internal - 2" NPT for direct connection to pipe. External - 3-1/4" Buttress. Fits Sta-Rite U11-200P Union Half for quick disconnect pipe connection.

STRAINER BASKET

DISCHARGE PORT COVER

TO FILTER OR POOL

SUCTION

PORT

FROM

POOL

OR

VACUUM

FILTERS

 

PUMP MAY BE BOLTED TO LEVEL

Figure 1

FOUNDATION OR MOUNTING BRACKET

INSTALLATION

Only qualified, licensed personnel should install pump and wiring.

Pump mount must:

Be solid - Level - Rigid - Vibration free. (To reduce vibration and pipe stress, bolt pump to mount.)

Allow pump suction inlet height to be as close to water level as possible. Pump will not lift water more than 10'(3m).

Allow use of short, direct suction pipe (To reduce friction losses). Allow for gate valves in suction and discharge piping.

Have adequate floor drainage to prevent flooding. Be protected from excess moisture.

Allow adequate access for servicing pump and piping.

NOTICE: When connecting threaded pipe directly to pump, use Teflon tape or Plasto-Joint Stik1 to seal connections. Do not use pipe dope; pipe dope causes cracking in some plastics and may damage components in piping sys- tem.

When connecting pipe to pump with union half, use Teflon tape or Plasto- Joint Stik between pipe and union adapter. Union collar to pump should be assembled dry and hand-tight.

NOTICE: Pump suction and discharge connections have molded in thread stops. DO NOT try to screw pipe in beyond these stops.

Teflon Taping Instructions:

Use only new or clean PVC pipe fittings.

Wrap male pipe threads with one to two layers of Teflon tape. Cover entire threaded portion of pipe.

Do not overtighten or tighten past thread stop in pump port!

If leaks occur, remove pipe, clean off old tape, rewrap with one to two addi- tional layers of tape and remake the connection.

NOTICE: Support all piping connected with pump!

1Lake Chemical Co., Chicago, Illinois

4

Page 4
Image 4
Mad Catz 5MPRA6D-147, 5MPRA6E-148, 5MPRA6E3-148, 5MPRA6F-156, 5MPRA6F3-156 Installation, Teflon Taping Instructions