P 2/ 8
Repair
CAUTION: Repair the machine in accordance with “Instruction manual” or “Safety instructions”.
[1] NECESSARY REPAIRING TOOLS
Code No. | Description | Use for |
1R285 | Round bar for Arbor | removing Plane bearing 10 from Front/ Rear wheels |
|
|
|
[2]ASSEMBLY/ DISASSEMBLY
[2]-1. Handle section
DISASSEMBLING
(1)Lift and remove Rear bag section from Deck. (Fig. 1)
While holding Handle section (Lower pipe, Upper pipe complete, etc.), loosen two M6 Thumb screws. (Fig. 1)
Handle section is removed. (Fig. 2)
(2)Remove two Holders
Remove two M6 Thumb nuts and M6x50 two Cup hex square neck bolts, and then separate Upper pipe complete from Lower pipe. (Fig. 3)
Lower pipe can be replaced.
(3)Loosen 4x18 Tapping screw, then remove Switch lever case and Switch lever case cover. (Fig. 4)
(4)Loosen four 4x18 Tapping screws, then remove Switch box cover complete
and Switch box. (Fig. 5) | Fig. 2 | |
(5) Remove Tension spring 9, and then separate Lever | ||
| ||
and M4x20 Pan head screw with WR (spring washer |
| |
and Flat washer) from Switch box and Switch lever. |
|
Upper pipe complete and Lever can be replaced. (Fig. 6)
Fig. 1
Upper pipe complete
Lower pipe
M8x35 Thumb screw (2 pcs.)
Deck
Rear bag complete
Lower pipe | M8x35 Thumb |
screw |
| Holder | M8x35 |
| Thumb screw | |
Fig. 3 | Fig. 4 |
|
| Switch lever | |
|
| Switch lever case |
Upper pipe complete | Lower pipe |
|
| M6 Thumb nut |
|
| (2 pcs.) | 4x18 Tapping |
|
| screw |
|
| Switch lever case cover |
M6x50 Cup hex square neck bolt | Upper pipe complete | |
| Holder |
|
Fig. 5 | Fig. 6 |
|
Switch lever | Switch box |
|
Switch box cover complete | Tension spring 9 | |
Switch box |
| Switch lever |
|
| |
4x18 Tapping |
| M4x20 Pan head |
screw (4 pcs.) |
| |
|
| screw with WR |
| Lever |
|