P 6/22

Repair

[3] DISASSEMBLY/ASSEMBLY

[3] -1. Bit holder section for BHR262, HR262D

Holder section for Drill chuck of BHR262T, HR262TD (cont.)

ASSEMBLING for BHR262T, HR262TD

(1)Assemble Change ring to Change cover. (Fig. 6)

(2)Assemble Torsion spring 31 to Tool holder, then mount Steel balls 6 to Tool holder. (Fig. 7) Note: Apply Makita Grease RB No.00 to Steel balls 6 to prevent them from falling off.

Fig. 6

Fig. 7

Note:

Face the chamfered end of the hole upward.

Aligning the hole of Change ring with that of Change cover, assemble Change ring to Change cover.

[Section a - a']

a

a'

Change ring

Change cover

Torsion spring 31

Insert the short arm of

 

Torsion spring 31 into

 

the hole of Tool holder.

 

Tool holder

long arm

 

 

Steel ball 6 (2pcs.)

(3)Assemble Tool holder to Change cover. (Fig. 8)

Fig. 8

Insert the long arm of Torsion spring 31 into the hole of Change cover through the hole of Change ring.

Tool holder

The long arm of Torsion spring 31

Change cover

Change ring

By turning Tool holder

 

approx. 75° clockwise,

75°

Tool holder can be

 

fastened to Change cover.

 

(4)Put Steel ball 5.0 in the groove surrounded by Change cover and Tool holder. (left in Fig. 9)

(5)Set Leaf spring and Flat washer 24 in change cover, then secure them with Ring spring 21. (right in Fig. 9)

(6)As for the assembling of Cap 35 side, do the reverse of disassembling steps. Refer to Fig. 4.

Fig. 9

Steel ball 5.0

Ring spring 21

 

Change cover

Flat washer 24

Tool holder

Leaf spring

 

Change cover

Page 6
Image 6
Makita HRH01ZX2 specifications Disassembly/Assembly