Speaker installation

 

Processing of Speaker Cable

Secure 2mm or more for the space in each rib

Rib outside suiting

 

and the soldering part.

0 1mm

 

 

Speaker Box

Rib

Rib

Rib outside suiting

01mm

2mm or more

Soldering Part

Inserts in latch

 

Rib

2mm or more

 

Rib

Inserts in Ditch

 

Inserts in the table side.

Inserts in ditch

3.7.Assembly of Antenna Board Part

Line processing of Antenna Cable (L)

Install the Antenna Board in the Bottom Case.

And process remainder of the Antenna Cable as shown in the figure below.

Process the cable

with the boss between ribs.

Install DC Jack in bottom

Boss

Antenna Cable (L)

Place between the bottom base and install.

Process the cable to the ditch of the Bottom Case.

Bottom Case

The terminal must become

straight below.

The upper side is close with the under latch is hooked the Bottom Case

Antenna Cover(L)

DC Jack Holder

Antenna Cable (L)

The under latch is hooked the Bottom Case

The under latch is hooked the Bottom Case

3-6

Page 26
Image 26
Matsushita CF-W4GWCZZ service manual Assembly of Antenna Board Part, Speaker installation Processing of Speaker Cable