THROUGH WALL WITH VERTICAL RISE AND HORIZONTAL TERMINATION INSTALLATION - FREESTANDING:
A 45° elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).
Figure 12 is the recommended installation set up.
Figure 13 is the installation to use if there is a concrete or retaining wall in line with exhaust vent on a pellet stove. The termination must be 12” (30 cm) from the outside wall and 12” (30 cm) above the ground.
Figure 11: Venting to use with straight through wall Installation.
High Temperature RTV
Silicone Required
Fresh Air Intake Tube
45° Elbow with screen or
Termination Cap
Wall Thimble
3" (75mm) or 4" (100mm) "PL" or "L" vent
Exhaust Tube
with local building codes. 6. Install a length of 3” (75 mm)
or 4” (100 mm) vent pipe into the wall thimble. The pipe should install easily into the thimble.
7. Connect the exhaust vent pipe to the exhaust pipe on the stove. Seal the connection with high temperature silicone.
8. Push the stove straight back, leaving a minimum of 4” (10
cm) clearance from the back of the stove to the wall. Seal the vent pipe to the thimble with high temperature silicone.
9. The pipe must extend at least 12” (30 cm) away from the building. If necessary, bring
another length of pipe (PL type) to the outside of the home to connect to the first section. Do not forget to place high temperature silicone around the pipe that passes through the thimble.
10. Install a vertical pipe, or if all requirements for direct venting are met, install vent termination. The stainless steel cap termination manufactured by the vent manufacturer is recommended. However, when the vent terminates several feet above ground level and there are no trees, plants, etc. within several feet, a 45° elbow can be used as termination. The elbow must be turned down to prevent rain from entering.
NOTE:
• Some horizontal through wall installations may require a “T” and 3 to 5 feet (91 to 152 cm) of vertical pipe outside the building to help naturally draft in the unit.
• This may be required if a proper burn cannot be maintained, after the stove has been tested and the airflow set.
• This is due to the back pressure in the exhaust caused by airflow around the structure.
• All sections of pipe must have three (3) screws evenly spaced and all horizontal and vertical vent sections located within the house must have a bead of high temperature silicone installed on the male end of the pipe before installation to create a gas tight seal.