2.6Start-Up Sequence
WARNING: | THERE ARE DANGEROUSLY HIGH VOLTAGES PRESENT WITHIN THE |
| ENCLOSURE OF THE POWER SUPPLY SYSTEM. CAUTION MUST BE TAKEN |
| WHEN WORKING WITH THE ENCLOSURE. IT IS RECOMMENDED THAT ALL |
| WORK BE PERFORMED BY QUALIFIED ELECTRICAL PERSONNEL ONLY. |
|
|
NOTE: INITIAL
1.
2.Make sure the input circuit breaker is in the off position.
3.Energize the primary building power.
4.Turn on the main AC input breaker.
5.Verify that the output voltage is within the specified range.
6.Verify output phase rotation is correct.
7.Turn the system off.
8.Connect the loads one at a time and repeat Step 5.
2 — 8 | Installation and Operation |